In Rio Grande, Rio Grande do Sul, our representative Fábio Neves, accompanied by the company's management team, participated in a visit to [Tergrasa](https://www.tergrasa.com.br/), at the invitation of the company and [Sindanave](https://www.sindanave-rs.com.br/). During the visit, Vice President Guilherme Dawson Júnior presented the terminal's expansion project, which is scheduled for completion in January 2027.
With an investment of BRL 700 million, the project includes the installation of new truck dumpers and four slewing shiploaders, with a loading capacity of up to 6,000 tons per hour. The new infrastructure will also feature conveyor belt systems installed in tunnels for handling grains and meals.
The expansion represents a significant step forward in Tergrasa's operational capacity, contributing to greater operational efficiency and strengthening Brazil's port infrastructure.
For Amart Shipping, participating in meetings like this is an opportunity to strengthen relationships, stay informed about relevant initiatives, and remain closely connected to the developments driving the industry's growth.
We thank Sindanave and Tergrasa for the invitation and warm welcome!